https://youtu.be/R-J4zxIScII?si=p0JCtMOqY1DBOsXD
Urban Lining –KN GLOBAL Headquarter / ZAIRA Architects & Engineers
The site is located at the southern end of Gwangjin Bridge, on a trapezoidal plot that had long been left undeveloped. The road in front, known as "Cheonho-dong Tool Street," is somewhat bustling, but once the building is completed, it will offer a picturesque view of the Han River framed by Achasan Mountain. The front and rear roads, with a 3.6-meter elevation difference, allow for easy underground parking without additional excavation. The client decided to build an office on this site, aiming to minimize construction costs and time by utilizing the existing terrain for a quick move-in. Due to the nature of neighborhood commercial facilities, the floor plan was significantly influenced by regulations and economic factors, requiring careful consideration of the façade and material expression.
부지는 히로쓰 오하시의 남단에 위치해 오랫동안 개발이 진행되지 않았던 사다리꼴 부지. 전면도로는 '치토동 공구거리'로 알려져 있으며 다소 붐비지만 건물이 완성되면 사가산을 배경으로 한강을 한눈에 볼 수 있는 아름다운 경관이 펼쳐진다. 전후 도로의 고저차는 3.6미터로 추가 굴착 없이 지하 주차장도 쉽게 설치할 수 있다. 고객은 이 부지에 사무실을 세우기로 하고, 기존의 지형을 살려 단기간에 입주할 수 있도록 하는 것으로, 건설비와 공기를 최소한으로 유지하는 것을 노렸다. 인근에 상업시설이 늘어서면서 평면계획은 규제나 경제요인에 크게 좌우되어, 외관이나 소재표현에는 세심한 주의를 기울일 필요가 있었다.
'자료' 카테고리의 다른 글
Toulouse ZAC Saint-Martin Residential Complex (0) | 2024.11.10 |
---|---|
DJI Flagship Store (0) | 2024.11.10 |
Greenhouse (0) | 2024.11.10 |
Sun Tower (0) | 2024.11.10 |
Maiden House (0) | 2024.11.10 |